Energy & Infrastructure

Project Resource Specialists

Latest opportunities

> All Opportunities

Senior Estimator (Pre-Construction)

SENIOR ESTIMATOR (PRE-CONSTRUCTION) required by our Client, an International Construction and Infrastructure company, to be hired on a contract basis located in UK.   Duration: 12 months ongoing   POSITION SCOPE   Reports to the Chief Estimator, the Senior Estimator… >more
Job Ref: 8614
UK
ESTIMATING ENGINEERS ONSHORE
Contract

Senior Electrical Engineer

SENIOR ELECTRICAL ENGINEER required by our client, to be hired on a contract basis, located in the USA. Duration: 12 months   POSITION SCOPE Senior Engineers are responsible for a range of engineering activities with significant independence. Working within integrated,… >more
Job Ref: 8608
North Dakota, Montana, and/or Idaho
ELECTRICAL DESIGN ENG ONSHORE
Contract

Senior Civil/Structural Engineer

SENIOR CIVIL / STRUCTURAL ENGINEER required by our client, to be hired on a contract basis, located in the USA.     Duration: 12 months     POSITION SCOPE   Senior Engineers are responsible for a range of engineering activities… >more
Job Ref: 8607
North Dakota, Montana, and/or Idaho
CIVIL ENGINEERS DESIGN ONSHORE
Contract

Latest news

> All News

Catcher FPSO Arrives at Oilfield in The North Sea

October 23, 2017
Commissioning activities have commenced on Premier Oil’s Catcher FPSO ahead of its 7-year contract at the oilfield. The floating production, storage and offloading (FPSO) vessel arrived in Cromarty Firth, in Scotland… >more

Premier Oil’s Catcher FPSO Arrives in the North Sea

October 10, 2017
The Catcher floating production, storage and offloading (FPSO) vessel arrived in Cromarty Firth on 10th October ahead of its 7-year contract at Premier Oil’s Catcher field. Mentor IMC Group, supporting… >more

UK Offshore Wind Hits Record Low Price

September 12, 2017
The price of offshore wind energy to be produced in UK waters hit a record low as the government awards contracts for a new series of offshore wind farms.  … >more

Total Plans Kaombo FPSO Output Start

August 1, 2017
Total has scheduled the dates for first output for its Kaombo FPSO off Angola. Total is set to begin production from one of the two Kaombo floaters in Angola as soon… >more

Floating Offshore Wind – Statoil’s Hywind project

July 24, 2017
Renewable energy technology in Europe has taken a step forward with the turbines of Statoil’s concept Hywind Pilot Park floating offshore wind farm shortly to be towed into position. The… >more
Website design by Gravitas London